1.
Who is the owner / developer of Oasis
Court?
Photizo Properties Limited
2.
What type of title does Oasis court title
have?
Government Allocation
3.
What type of infrastructure will the
estate provide?
Perimeter Fencing, Drainage System, Interlocked
Road Network Within the Estate, Electricity
Lights
4.
What is the payment structure?
Outright: 0 - 3 Months ₦41,160,000
5.
What type of building is avaliable on
Oasis Courts?
2 bedroom detached Bungalow. Each unit footprint
is sitting on 215sqm
6.
What is the delivery time for each
building?
Immediate allocation after initial deposite
(Outright Only)
7.
Would there be statutory charges?
Yes, There will be statutory charges of:
Description |
Content |
Deed of Assignment |
2.5% of the total property |
Survey |
#500,000 and other fee as may be
required by the
government |
Description |
Content |
Account Name |
Photizo Properties Limited |
Banks |
Zenith Bank (1015949898), GTBank
(0450619240) |
To be paid directly into the company's account
provided below together with the the total cost
the property.
8.
Would there will be infrastructure fee
Yes, there Would be infrastructure fee to be
paid into the designated account provided below
Description |
Content |
Insfrastructure: |
#4,000,000 |
Description |
Content |
Account Name |
PP LTD/ INFRASTRUCTURE
MANAGEMENT |
Banks |
GTBank (0645433082) |
9.
Can I pay to your agent?
As much as we are trying not to discredit our
agents, its the company policy that all payment
be made into the
company'saccounts. All cheques and bank drafts
should be made in favour of Photizo Poperties
Limited. The Company
will not be responsible for any loss occuring
from not adhering to the policy.
10.
If I make outright or installment
payments for the house and i'm no longer
interested can I get a refund?
Yes, you can get a refund but you are required
to give a 90 days notice in writing to the
company from which your refund shall be
processed and shall be fully refunded but less
30% administrative fees.
11.
How will I get the C of O in my name
when the document is out?
The company will communicate that to you when
the C of O is ready and you will be responsible
for the perfection of your title
12.
Will there be service charge?
Yes. The service charge will be added to the
estate dues.
13.
What will I get after the payment?
After the 20% initial deposit, you are entitled
to a receipt and contract of sales. You will get
deed of assignment 90 days after full payment
has been made.
Your survey will be provided to you after all
statutory fees has been fully paid for and you
are being allocated.
14.
What happen if I can not continue with
the payment, Can I get refund?
Yes, you can get a refund but you are required
to give a 90 days notice in writing to the
company from which your refund shall be
processed and shall be fully refunded but less
30% administrative fees.
15.
When Will I get my allocation?
Physical allocation will be done 12 to 18 months
after the full payment of total purchase price
and statutory charges.
Re-allocation of any unit attracts extra
charges.
16.
What is the foundation details of Oasis
court?
Before embarking on construction, soil test was
carried out which informed the kind of
foundation in place. A Raft foundation was done.
The development and foundation are higher than
existing road levels.
17.
What are the finishing details of Oasis
Court?
Electrical fittings and lightings, All
sanitaries Wares Fittings, Internal painting,
Internal and External Doors, Fitted kitchen,
Tilling, POP installation, Windows.